loader

West Africa's first Drone Corridor

Energy Infrastructure

10%

Increase in energy access from 16% in 2017 to 26% in 2020

75,000

Number of people with access to renewable energy in 60 communities. Ongoing expansion to 200,000 persons in 94 communities by end of 2021

530 KM

Transmission lines of the "Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG)" electricity networks interconnection

28%

Increase in customers from 185,000 to 235,000 by EDSA

80MW

Peak utilisation of power on the Freetown network has risen 30% from 55MW to 80MW

Summary of Road Gains since 2018

Gains in the Road Subsector since 2018

Major & Minor Regravelling Works

Feeder Roads

Feasibility Studies & Detailed Engineering Design Across the Country